Descripción de la publicación
Coming soon!
- Basic information
Ton: 100 T
Type: Hydraulic all terrain crane
Year: 2012
Main Boom: 60 mtr.
Jib: 10/17 mtr. bi-fold swingaway
- Details
Kilometers: 83.480 (28-08-2024)
Lower Hours: 3.861 (28-08-2024)
Carrier Engine: Mercedes OM 502 LA
Upper Engine: Mercedes OM 904 LA
Upper Hours: 10.500 (28-08-2024)
Gear Box: Daimler Chrysler G 240 - 16
Tires: 16.00 R25 (95% Michelin)
Axles Config.: 10 x 8
Suspension: MEGATRAK
Chassis: Grove
LMI System: EKS
Load Chart: 75% metric
Hook Blocks: 1 x 3 sheave / 1 x ball
Winch: 1
Counterweight: Full (UK Version)
Manuals: Yes
Grove GMK 5095
Descripción de la publicación
Coming soon!
- Basic information
Ton: 100 T
Type: Hydraulic all terrain crane
Year: 2012
Main Boom: 60 mtr.
Jib: 10/17 mtr. bi-fold swingaway
- Details
Kilometers: 83.480 (28-08-2024)
Lower Hours: 3.861 (28-08-2024)
Carrier Engine: Mercedes OM 502 LA
Upper Engine: Mercedes OM 904 LA
Upper Hours: 10.500 (28-08-2024)
Gear Box: Daimler Chrysler G 240 - 16
Tires: 16.00 R25 (95% Michelin)
Axles Config.: 10 x 8
Suspension: MEGATRAK
Chassis: Grove
LMI System: EKS
Load Chart: 75% metric
Hook Blocks: 1 x 3 sheave / 1 x ball
Winch: 1
Counterweight: Full (UK Version)
Manuals: Yes