Descripción de la publicación
2002 Grove GMK 5240, 240 Ton All Terrain Crane; CranesList ID: 932
44' - 197' Six section, Full-Power Boom with patented TWIN-LOCK boom pinning system with Auxiliary Lifting Sheave,
43' - 72’ Bi-fold Lattice Swing Away Extension (Jib) Hydraulically Off-settable (5° - 40°),
2 x 28' Jib inserts for a total of 125' of Jib,
Cummins Diesel Engine (Up),
Main and Auxiliary Winches with 22 mm Wire Rope
2 Speed, Grove EKS4 Load moment and anti-two block system with ECOS Operating System audio/visual warning and control lever lockout provides electronic display of boom angle, length, radius, tip height, relative load moment, maximum permissible load, load indication and warning of impending two- block condition,
Headache Ball,
125 Ton, Five Sheave Hook Block,
154,300# of Counterweights with hydraulic removal system,
Air Conditioning and Heater in both cabs,
RECENT UPPER SERVICE & REPAIRS - new ecos in 2023 Hours 3432, telescope cylinder was done in 2020, boom lift cylinder was done in 2020, hydraulic hoses for hydraulic hose reel on side of boom were replaced in 2021, replaced wiring harnesses to left and right joysticks in 2022, lower part of seat was replaced 2023, jib wiring and plugs were all replaced in 2023, new fuel shut off solenoid in 2023, re-sealed hydraulic hose drum swivel for jib in 2023, new right arm rest in 2023,
10’ Wide, 5 Axle Grove Carrier,
Cummins Diesel Engine (Down) with Constant Throttle Brake,
Allison Automatic Transmission,
Front and Rear Tires: 20.5R25,
Tri Axle Dolly,
Current 3rd Party Inspection - Kempco Inspection Services,
RECENT LOWER SERViCE & REPAIRS - replaced front steer cylinder in 2022, re-sealed 3 steer cylinders in 2022, replaced all brakes on dolly in 2022, both carrier bearings replaced in 2022, transmission was replaced in August 2023, transmission cooler was removed and cleaned August 2023, replaced old hydraulic hoses around pumps in August 2023, new driveshaft from transmission to drop box in 2023, new planetary input seal and bearing replaced on rear passenger side wheel 2023, new cardon shaft on rear passenger side in 2023, replaced four tie rods on steering links in January 2024, replaced front passenger side suspension cylinder in June 2024.
http://www.CranesList.com
LOCATED IN TEXAS!
Grúas todo terreno
Grove GMK5240
published 9 Oct 24
112vistas
USD 479,900
Venta
Métrica / Imperial
Año:
2002
Condición:
Usada
Capacidad max.:
240US tn
Horómetro:
3432
Pluma:
197ft
Plumín 1:
125ft
Malacates:
2
Ganchos:
2
Luffing jib:
yes
Super lift:
no
Jeffery Lomas
+15627432338
https://www.craneslist.com/
Descripción de la publicación
2002 Grove GMK 5240, 240 Ton All Terrain Crane; CranesList ID: 932
44' - 197' Six section, Full-Power Boom with patented TWIN-LOCK boom pinning system with Auxiliary Lifting Sheave,
43' - 72’ Bi-fold Lattice Swing Away Extension (Jib) Hydraulically Off-settable (5° - 40°),
2 x 28' Jib inserts for a total of 125' of Jib,
Cummins Diesel Engine (Up),
Main and Auxiliary Winches with 22 mm Wire Rope
2 Speed, Grove EKS4 Load moment and anti-two block system with ECOS Operating System audio/visual warning and control lever lockout provides electronic display of boom angle, length, radius, tip height, relative load moment, maximum permissible load, load indication and warning of impending two- block condition,
Headache Ball,
125 Ton, Five Sheave Hook Block,
154,300# of Counterweights with hydraulic removal system,
Air Conditioning and Heater in both cabs,
RECENT UPPER SERVICE & REPAIRS - new ecos in 2023 Hours 3432, telescope cylinder was done in 2020, boom lift cylinder was done in 2020, hydraulic hoses for hydraulic hose reel on side of boom were replaced in 2021, replaced wiring harnesses to left and right joysticks in 2022, lower part of seat was replaced 2023, jib wiring and plugs were all replaced in 2023, new fuel shut off solenoid in 2023, re-sealed hydraulic hose drum swivel for jib in 2023, new right arm rest in 2023,
10’ Wide, 5 Axle Grove Carrier,
Cummins Diesel Engine (Down) with Constant Throttle Brake,
Allison Automatic Transmission,
Front and Rear Tires: 20.5R25,
Tri Axle Dolly,
Current 3rd Party Inspection - Kempco Inspection Services,
RECENT LOWER SERViCE & REPAIRS - replaced front steer cylinder in 2022, re-sealed 3 steer cylinders in 2022, replaced all brakes on dolly in 2022, both carrier bearings replaced in 2022, transmission was replaced in August 2023, transmission cooler was removed and cleaned August 2023, replaced old hydraulic hoses around pumps in August 2023, new driveshaft from transmission to drop box in 2023, new planetary input seal and bearing replaced on rear passenger side wheel 2023, new cardon shaft on rear passenger side in 2023, replaced four tie rods on steering links in January 2024, replaced front passenger side suspension cylinder in June 2024.
http://www.CranesList.com
LOCATED IN TEXAS!
Ubicación
Texas, Texas, United States