#SPMT
↓ Pull down to refresh
Pull to refresh
New design SPMT/MT, integrated with under chassis PC and outrigger X, 20x20, exclusive windmill
22ND NOVEMBER 2022
GE RENEWABLE SELECTS MAMMOET UK
READ YOUR FREE COPY HERE: https://moveitmagazine.com/2022/11/22/ge-renewable-selects-mammoet-uk/
Teesside-based Mammoet UK has been selected by GE Renewable Energy to supply onshore heavy lifting and transport for the staging and assembly of turbine components for the Dogger Bank Wind Farm. Dogger Bank Wind Farm is a joint venture between SSE Renewables, Equinor and Vårgrønn.
Mammoet will employ multiple lifting and transport crews for simultaneous operations to support with the loading of equipment and tower assembly in the marshalling harbor, a key piece in constructing the project. The team will utilize cranes and self-propelled modular transporter (SPMT) axles at Able Seaton Port, the Dogger Bank Wind Farm marshalling harbor. GE will start preparing the marshalling harbor and receiving components at the end of 2022.
Nathan Fahey, GE Project Director for the Dogger Bank Wind Farm, said, “We are delighted to announce that we have selected Mammoet UK as our cranes and logistics supplier for the Dogger Bank Wind Farm. The cranes and associated equipment the company will provide and operate for us will be essential to the smooth operation of our marshalling harbor on Teesside, where 277 sets of blades, nacelles and towers of our Haliade-X wind turbines will be erected and transit over the course of the project. We believe Mammoet has the right expertise and equipment to be an excellent partner for us.”
Darren Adams, Mammoet’s Group Commercial Officer, said, “Mammoet is delighted to work in close partnership with GE to help build the world’s largest offshore wind farm. The project is a large step towards a net-zero future, delivering a boost for the local economy and wider 2030 and 2050 emissions targets. By utilizing Mammoet’s strong presence in the UK, headquartered from Teesside, backed up by its network of international engineering hubs, we will enable the delivery of clean, cost-efficient energy to around six million homes.”
Dogger Bank Wind Farm is located over 130 km off the north-east coast of England and each phase will be able to produce 6TWh of renewable electricity, totaling 18TWh annually, when complete in 2026 – equivalent to powering approximately the equivalent of six million UK homes each year or around 5% of the UK’s electricity demand. Due to its size and scale, the site is being built in three consecutive phases: Dogger Bank A, Dogger Bank B and Dogger Bank C.
“This contract represents not just a win for Mammoet and renewable energy investment but for the people of Teesside,” said UK Managing Director, Mark Sadler. “Securing the project means even greater potential investment and business growth that will expand our existing pool of highly skilled labor with renewables expertise in the region. We have a great opportunity to support GE Renewables and other businesses building the UK’s fast-growing offshore wind energy market.”
2nd photo: Mammoet UK’s headquarter in Thornaby, Teesside.
3rd photo: Mammoet UK Managing Director, Mark Sadler.
#Mammoet #UK #Teeside #GE #RenewableEnergy #DoggerBank #WindFarm #MoveItMagazine
SARENS - Picture Of The Month 😎💙
PROJECT DETAILS: Dismantle an existing Goliath gantry crane and replace it with a new, larger one.
LOCATION: St. Nazaire, France
EQUIPMENT: CC 6800 + M1500 + LTM 1160 + RT 780, SMLT tower system 5800 and 3500, 152 axle lines of SPMTs, 4 x 650-tonne strandjacks, 2 skidding systems
#project #france #SARENS #teamblue #innovative #thecraneclub
At a refinery in the Midwest, #DeepSouthCrane transported, removed, and replaced six 550,000-pound coke drums using a double-width 12-line #Scheuerle SPMT, a 2,500-ton VersaCrane TC-36000 in a 253-foot radius, and a 660-ton Liebherr LR-1600 which served as a tail crane.
#deepsouthcraneandrigging #flashbackfriday #versacrane
“want-to-hoist-for-you” supplies her customers an unrivalled service by supplying (heavy) lifting, hoisting, rigging and specialised transport professionals for both long and short term contracts.
When it comes to a specialist labour supplier, 12hoist4u can provide your company with the following professionals:
Technical Authority
Subject Matter Expert
Rigging Engineer
Integrated Transport and Heavy Lift Project Manager
Heavy Lift Project Manager
Heavy Lift Supervisor
Offshore Heavy Lift Supervisor
Offshore and Subsea Procedure Developer and Liftplan reviewer
Crane and Transport Supervisor
Appointed Person – Person in Charge – Competent Person
Health and Safety Supervisor specialized in Hoisting and Lifting
Auditor on Procedure Compliance
Consultant for Incident Investigation
Assessor
Crane and Rigging Coach
Trainer - Instructor
Crane Coordinator
Hoisting and Lifting Equipment Inspector
Hoisting, Lifting and Specialized Transport Engineer
Tower Crane Operator (saddle/luffing jib)
Pedestrian Tower Crane Operator
Mobile Tower Crane Operator
Mobile Crane Operator
Crawler Crane Operator
Lattice Boom Heavy Lift Crane Operator
Offshore Heavy Lift Crane Operator (1000 ton and above)
Offshore Pedestal Crane Operator
Offshore Knuckle Boom Crane Operator
Offshore Subsea Crane Operator
Pile Driving Crane Operator
Side Boom Crane Operator
Overhead Travelling Crane Operator
Heavy Haulage Driver / Exceptional Transport Driver
Self-Propelled Modular Transporter (SPMT) Operator
Gin Pole Truck Operator
Winch Truck Operator
Telehandler Operator
Forklift Operator
Mobile Elevating Work Platform (MEWP) Operator
Industrial Relocation Specialist - Technical Transport Specialist
Rigger (onshore and offshore)
Signaller - Banksman
Slinger
You have seen it all